Skip to content
A contemporary hospital building with a white facade

Engineering and construction

Buildings that have to work

NORDENIX designs, builds and commissions hospitals, data centres, laboratories and corporate headquarters. Buildings where the systems matter more than the facade, and reliability is measured in percentages.

Engineers working on BIM models in the office
facilities in operation

Company

An engineering company that also builds

  • In-house engineeringStructure, services and process in one team.
  • Digital twinA building model for operation and maintenance.
More about the company
Vladimir PantićCEO, mechanical engineer

Why NORDENIX

Reliability proven by measurement

Clients in healthcare, technology and industry choose us for data, not presentations.

data centre availability

99.9%

lower energy use

34%
  • Single responsibility
  • Integrated design
  • Integrated testing
  • Transparent data

Process

Five phases with gateways

Each phase ends with a gateway the client approves.

  1. 01

    Inquiry

    First requirements, NDA and workshop plan.

  2. 02

    Consultation

    Technical workshop and measurable targets.

  3. 03

    Planning

    Integrated design, BIM and procurement.

  4. 04

    Construction

    Delivery with digital quality control.

  5. 05

    Handover

    Tests, reports and the digital twin.

Key figures

Results in numbers

facilities in operation
data centre availability
lower energy use
engineers

Team

  • Portrait of Vladimir Pantić
    CEO, mechanical engineer

    Vladimir Pantić

  • Portrait of Maja Simić
    Director of engineering

    Dr Maja Simić

  • Portrait of Aleksandar Ristić
    Director of construction

    Aleksandar Ristić

  • Portrait of Nina Kovačević
    Head of BIM and digital services

    Nina Kovačević

Client experience

What facility owners say

Before handover they cut power to the whole data centre to prove the system worked. It did.
Head of infrastructureTelecom operator
  • “The operating theatre conditions were in the report, measured, before the first patient.” Hospital director
  • “We use the digital model every day for maintenance. We know where every valve is.” Facilities manager

NORDENIX

Planning a facility with complex systems?

Book a technical workshop with our engineers. The first conversation is without obligation.

Book a consultation
  • Medicus Centre
  • Telenord
  • Farmalab
  • Institute of Materials Science
  • Ušće Holding
  • Elektronord